Our Impact

Vietnam's waste problem is large. The market opportunity is larger. ARC-V addresses both.

Every tonne diverted is a measurable win

Landfilled waste generates methane, a greenhouse gas 80 times more potent than CO2 over 20 years. Incineration produces dioxins, heavy metals, and CO2. The ARC Process produces neither.

1.2

tCO2e avoided

per tonne diverted from landfill

Based on IPCC landfill methane emission factors. Each tonne of MSW processed by ARC-V avoids approximately 1.2 tonnes of CO2-equivalent greenhouse gas emissions.

0%

landfill

waste from ARC-V processed material

The ARC Process is designed for total material recovery. No fraction of the input waste stream is sent to landfill. This is a design constraint, not a target.

0

incineration

no combustion in the ARC Process

SynCoal production uses thermal conversion at controlled temperatures, not open combustion. No stack emissions. No dioxins. No ash residue requiring disposal.

500

green jobs

per full-scale 3,000 TPD facility

Each full-scale ARC-V facility creates approximately 500 jobs in waste processing, bioprocessing, product handling, and logistics in the communities that generate the waste.

What existing solutions cannot do

Organic-focused systems like composting and BSF handle food waste. Inorganic systems like RDF and incineration handle plastics. Neither eliminates landfill. Neither produces zero emissions. ARC-V is the complete system.

Capability
Composting / BSF
RDF / Incineration
ARC-V
Processes organic waste into product Yes No Yes
Processes non-organic waste into product No Partial Yes
Zero landfill residual No No Yes
Zero incineration, zero stack emissions Yes No Yes
Revenue from all waste fractions No No Yes
Modular, scalable facility deployment Partial Partial Yes

A $10 billion problem with no current solution

Vietnam's non-recyclable municipal solid waste market is projected to reach $10 billion by 2034. Today, it is almost entirely unaddressed. ARC-V is positioned to serve it.

Waste collection in Vietnam

MSW generated nationally

75,000

t/day

Vietnam is one of the fastest-growing MSW markets in Southeast Asia. Current infrastructure processes less than 15% of this volume.

Non-recyclable MSW market

$10B

by 2034

The non-recyclable fraction represents the largest share of the market. It is also the fraction the ARC Process is designed to convert.

Direct competitors in Vietnam

0

operators

No operator in Vietnam currently offers zero-landfill, zero-incineration total MSW processing at scale.

From pilot to national scale

ARC-V's growth path follows a proven model: establish operational credibility at pilot scale, then replicate across provinces.

2026

5 TPD Pilot Facility

  • Prove the ARC Process under Vietnamese regulatory and operational conditions
  • Products certified for local market
  • Technology licensing agreement operational

2027

100 TPD Regional Scale

  • Scale to first commercial-scale facility
  • Product revenues cover operating costs
  • SynCoal supply to steel and cement customers
  • Insect Protein supply to aquaculture

2028+

3,000+ TPD National Deployment

  • Multi-province rollout targeting Vietnam's largest MSW-generating cities
  • Gate fee contracts with municipal authorities
  • Full material recovery across the waste stream